The Shenandoah South 6H (SS‐6H) well delivered a record average 20‐day initial production (IP20)flow rate of 10.3 million cubic feet per day (MMcf/d) from an 8,635‐foot (2,632‐metre) horizontalsection within the Mid Velkerri B Shale.
On a normalized basis, SS‐6H achieved a flow rate of 11.9 MMcf/d per 10,000 feet, which comparesfavorably to the average performance of more than 11,000 producing wells in the Marcellus Shaledry gas fairway with over 12 months of production history.
The flow test has now been concluded, with the well delivering a stable rate of8.8 MMcf/d (normalized to 10.









