Reviewing the quarterly updates from operators in the Cooper Basin points to ongoing activity with some exciting results reported.
During the last quarter, Santos reported drilling 21 wells across the Cooper Basin including 17 gas and four oil wells with 14 of them connected for production. They continue their flood recovery works following last year’s unprecedented flood event, despite record local rainfall, with 10 flood-impacted wells returned to production during the quarter. A further 30 development wells are drilled but unconnected, awaiting access to be restored.
JV Partner Beach reports that the wells they participated in included exploration success at the Kwagga and Chinstrap fields, with Kwagga 1 discovering gas in both the primary Toolachee Fm target, and also the secondary Patchawarra Fm, whilst Chinstrap 1 discovered gas in the Callamurra Sst.










