CGG Earth Data is continuing to expand its new GeoVerse Carbon Storage database and screening studies.
Company Updates


Searcher Rectifies Sudan 2D as 3D Seismic Campaign Advances
Searcher has announced the Sudan 2D Rectified Seismic Dataset, in cooperation with the Sudan Ministry of Energy and Petroleum.

Shearwater Seals new Survey Award in Bonaparte Basin
Shearwater GeoServices and WesternGeco have signed a global agreement for seismic acquisition services and announced a new survey award in Australia.

Australia Licensing 2022, PGS declares, ‘We’ve Got You Covered in the Browse Basin’
PGS data has targeted key blocks for the 2022 Australian license round, which have now been officially released by the Government of Australia.

Schlumberger Teams up with Cognite to Optimise Reservoir and Wells Performance
Schlumberger and Cognite have announced a strategic partnership to integrate Schlumberger’s Enterprise Data Solution for subsurface with Cognite Data Fusion®, Cognite’s open industrial DataOps platform.

Carpentaria Continues to Kick Goals for Empire in the Beetaloo
Empire Energy has announced that the Carpentaria-2H well in the Beetaloo Basin has continued to deliver strong flow rates with the added bonus of low CO₂ composition.

Shearwater Collaborates with NVIDIA to Optimize Reveal for GPU
Shearwater has announced collaboration with NVIDIA for optimization of the most compute-intensive algorithms in the Reveal seismic processing software for NVIDIA’s high-end GPUs (graphics processing units).

PGS Signs Multi-Year MultiClient Library Access Agreement with Shell
PGS and Shell have entered into a multi-year agreement for access to a significant part of PGS’ MultiClient Data Library.

Shearwater Wins 4D Seismic Processing Project Over Wheatstone Field
Shearwater has been awarded a large time-lapse seismic imaging project over the Wheatstone field by Chevron Australia under an existing master contract.

Empire Elated with Exceptional Gas Flow Results at Carpentaria-2H
The Carpentaria-2H (C-2H) well has continued to deliver strong production flow rates with minimal declines for Empire Energy Group in the Betaloo sub-basin of the Northern Territory.
Empire Energy said extended production testing had continued at the well, located in its 100% owned and operated EP187 tenement, with gas flowing at an average rate of 2.6mmscf/day over the first 13 days and a normalised rate of 2.8mmscf/day per 1000m horizontal section.
The well had been shut-in for two days to replace the hydraulic stimulation wellhead with a flow testing wellhead and to monitor pressure build-up.
