• Member Login
  • |
  • Join Now
PESA - Energy Geoscience

Promoting Professional and Technical Excellence in Energy Geoscience – Networking, On-going Professional Education, Monthly Technical Meetings

  • Home
  • About
    • About PESA
    • Objectives
    • PESA History
    • PESA Affiliates
    • Constitution and Rules
    • Strategic Plan
  • Events
    • Online
    • NSW / ACT
    • QLD
    • SA / NT
    • VIC / TAS
    • WA
    • Industry
    • Social
    • Past Events
  • Membership
    • Join Us
    • APPEA Conference Discounts
    • AEGC 2025 Travel Bursaries
    • PESA Membership Awards
  • Latest News
    • All News
    • Feature Articles
    • Industry
    • Company Updates
    • Tech Talk (public)
    • PESA Branch Activities
  • Library
    • Technical Library
    • PESA Gazette
    • Webinars
    • PESA News Magazine
    • Knowledgette Recordings
  • Scholarships
  • Employment
    • View Job Opportunities
    • Submit Job
  • Contact
Feature Articles
Industry

NOPSEMA invites public to comment on Scarborough Project proposal

Posted by Dale | 09/07/2019

Woodside Donaldson LNG carrier

09/07/2019 by Dale

share
share
tweet

NOPSEMA has opened public comments for Woodside’s proposed Scarborough Project development.

The oil and gas independent, which has a 75% stake in the development, is proposing to develop the remote gas resource through new offshore facilities with all subsea and subsea infield infrastructure and wells located in Commonwealth waters, 375km off the Burrup Peninsula.

The plan is for the 7.3Tcf to come reach the mainland t via a 430km trunkline and to be processed via Train 2 expansion of the Pluto LNG plant — after construction of a number of subsea, high rated gas wells, tied back to a semi-submersible floating production unit moored in approximately 900 metres of water.

The trunkline from the FPU to the onshore Pluto LNG facility will be the only part of the offshore development which traverses State waters. The location at which the trunkline will cross into State waters is about 20 km north-west from the shore and in water depths of 31 metres.

The proposed development of Scarborough is an integral part of Woodside’s Burrup Hub vision for a regional gas hub which will secure economic growth and local employment opportunities for Western Australia.

In addition to the development of the Scarborough and North Scarborough fields, the Thebe and Jupiter gas fields provide opportunities for future tieback to Scarborough infrastructure. As the proposed export trunkline route crosses the Carnarvon Basin, in close proximity to other undeveloped fields, Woodside is also engaging with other resource owners to explore opportunities for future development.

Woodside is targeting a final investment decision in 2020 and for start-up in 2023. Achieving these milestones is subject to all necessary joint venture approvals, regulatory approvals and appropriate commercial arrangements being finalised. The first drilling phase is targeted in 2020 followed by the installation of the trunkline in 2022, FPU installation in 2023 and phase 2 drilling (potentially including Thebe and Jupiter) in 2025. Decommissioning is expected to commence in 2055.

The project area includes three zones:

Offshore project area (the area covered by WA-1-R, WA-62-R, WA-61-R, and WA-63-R)
The trunkline project area (the proposed trunkline route with a 1 km buffer either side)
The borrow grounds project area (the proposed location for the borrow grounds from which stabilisation material from the export pipeline will be sourced).

Studies and reviews of the Exmouth Plateau and North West Shelf have been compiled and/or undertaken to provide an understanding of the physical, biological and socio-economic environmental conditions within the project area.

These studies contribute to long-term datasets for the region and the majority have been made available in the public domain.

The environment that may be affected (EMBA) by Scarborough is the largest spatial extent where unplanned events could have an environmental consequence on the surrounding environment has also been described.

The offshore project proposal has defined environmental performance outcomes for all receptors that may be impacted by the activity from planned and unplanned events.

Related Articles

Dr Graeme Bethune
‘Gas and Oil exploration renaissance finally underway’

25/06/2019

Woodside to operate Scarborough

12/03/2018

NOPSEMA accepts proposal to develop Scarborough gas fields

07/04/2020

Shell gets NOPSEMA approval for Bratwurst-1 well

20/05/2019

Show CommentsHide Comments

Become a Member

petroleum exploration society member badge

Join PESA now and enjoy full membership benefits

  • access to fully searchable technical library
  • extensive networking opportunities with industry leaders and peers
  • further professional education and training
  • and more!

VISIT MEMBERSHIP PAGE

View Upcoming Events By Branch

PESA Events by State PESA Events in Western Australia PESA Events in South Australia and Northern Territory PESA Events in Victoria and Tasmania PESA Events in NSW PESA Events in Queensland

(Click on the the map)

Sponsored

PESA MAGAZINE – LATEST EDITION

PESA News Issue 173

Previous Editions

POPULAR POSTS

  • Shell Discovery Map WA Shell makes ‘significant’ gas discovery offshore Australia
  • APPEA CEO Samantha McCulloch Meet Samantha McCulloch, APPEA’s new CEO
  • USA oil exports exceeded imports 2019 How the USA became the world’s largest crude oil exporter in 2019
  • PESA WA Winter warmer at the Museum
  • SA announces successful applicants for acreage in Cooper and Otway Basins
  • CUE Permits NWS Ironbark exploration well delivers a disappointing duster

Norwood Resources

the Norwood resource

PESA members please use this group to help with "social license to operate" issues.

TOPICS

AEP Annual General Meeting Archer AVO AVO inversion Barry Goldstein Award Bowen inversion Branch News Bruce Ainsworth climate change complex seismic wavefield core workshop Dorado Early Triassic eFWI elastic full waveform inversion Energy Geoscience GA Golf Henry Posamentier Industry News Middle Triassic Mungaroo inversion NWS inversion PESA petroleum cores Qld Queensland CSG Queensland gas SA/NT Scholarships seismic inversion sequence boundary Social Surat-Bown Basin systems tracts WA wave influenced deltas WEB-AVO inversion women in energy women leadership women leadership scholarships womens career development women scholarships Zillmere core store

PESA - Energy Geoscience

PESA Energy Geoscience is a non-profit association of individuals involved in the exploration of oil and gas.

Connect with us

Subscribe to our newsletter and stay on the loop of what is happening in the field of Energy Geoscience and events near you.

pesa newsletter
* indicates required

PESA Energy Geoscience will use the information you provide on this form to be in touch with you and to provide updates and marketing. Please confirm you give us permission to contact you via your email address:

You can change your mind at any time by clicking the unsubscribe link in the footer of any email you receive from us. We will treat your information with respect. For more information about our privacy practices please visit our website. By clicking below, you agree that we may process your information in accordance with these terms.

We use Mailchimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to Mailchimp for processing. Learn more about Mailchimp's privacy practices.

Copyright © 2025 PESA - Energy Geoscience. All Rights Reserved.

  • Advertise
  • Contact
  • Policies
  • Privacy
  • Terms & Conditions