On 21 January 2025, Carnarvon Energy announced that the Santos operated Dorado Phase 1 liquids development will not enter FEED and hence the previous target of FID in 2025 will be deferred.
The Dorado Joint Venture of Santos (80% and operator), Carnarvon (10%) and CPC (10%) are continuing to review the timeline for the project with additional exploration wells within the permit planned for 2026.