Successful Dorado-3 Baxter flow test exceeds expectations
Initial flow testing of the deeper Baxter reservoir of the Santos-operated Dorado-3 well has successfully exceeded expectations.
Carnarvon Petroleum, which holds a 20% stake in Dorado, said the initial clean-up flow rate test over the Baxter Member was conducted over a 12-hour period with the flow rate constrained by the surface well equipment.
The company said the flow rate achieved a maximum possible measured rate of approximately 48 million standard cubic feet (“MM scf”) per day...