Tamboran has spudded the Shenandoah South 2 (SS-2H) well in EP 98, which is being drilled off a new pad located approximately 3 miles north of the Shenandoah South 1H (SS-1H) well and within the Tamboran-operated SS Pilot Project area (47.5% working interest).
Tamboran said that following the drilling of the SS-2H well, the JV will immediately drill the Shenandoah South 3H (SS-3H) well off the same pad ahead of the stimulation program.
The SS-2H and SS-3H wells will be drilled with the Helmerich & Payne super-spec FlexRig® Flex 3 rig and will target the Middle Velkerri B Shale at a depth of approximately 3,020 metres.










