BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//PESA - Energy Geoscience - ECPv6.16.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://pesa.com.au
X-WR-CALDESC:Events for PESA - Energy Geoscience
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Sydney
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20230401T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20230930T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20240406T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20241005T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20250405T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20251004T160000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20241008T120000
DTEND;TZID=Australia/Sydney:20241008T143000
DTSTAMP:20260607T062316
CREATED:20240919T030433Z
LAST-MODIFIED:20240919T032000Z
UID:10008621-1728388800-1728397800@pesa.com.au
SUMMARY:PESA ACT/NSW October Technical Lunch
DESCRIPTION:PESA NSW September Technical Meeting\nMelbana in Cuba: the Amistad-1 success story\nMelbana Energy drilled the Alameda-1 discovery well in onshore Cuba in 2021.  By 2022 the discovery was independently certified by McDaniel (A Canadian based Reserves Certifier with extensive experience in Cuba) to contain over 5 billion barrels of oil in place (best estimate) and 267 million barrels of recoverable oil (best estimate). \nIn 2023 Melbana followed up the Alameda-1 well with the successful Amistad-1 appraisal well which was designed to test the uppermost sheet of reservoirs in the Alameda field (Unit 1A\, 1B\, 2 and 3). \n\nUnit 1A recovered 11.7° API oil with 3\,783 cP viscosity at surface from a 63 metre MD interval starting from 445 metres MD. Although flow rates at surface were not established 40 barrels of oil flowed unassisted to surface (through a 32/64” choke)\, exceeding expectations.\nUnit 3 intercepted 200 metres updip and 500 metres to the south of the Alameda-1 intercept and confirmed moveable oil of a similar quality to Unit 1A. Testing indicated the potential to flow at ~750 bopd. The Unit 2 DST did not demonstrate moveable hydrocarbons to surface at the location tested.\nUnit 1B recovered 19.4° API oil with 5.7 cP viscosity at surface from a 70 metre TVD perforated section – less than 20% of the total Net Pay for Unit 1B (when incorporating fractures). Stabilised unassisted flow rate to surface of 1\,235 bopd measured over 12 hours on a 36/64” choke\, peaking at 1\,903 bopd.\n\nLogged Net Pay for the entire Amistad Formation is 346 metres TVD using 9% porosity\, 50% Sw and 40% VSh cutoffs this  net pay increases to 615 metres when the highly fractured limestones are incorporated (45% of the gross interval). Flow from the fractured interval has been proven by acquisition of production logs validating the incorporation of fractures into the net pay equation. \nUnit 1B has now been completed for future production\, whilst Units 1A and 3 have been suspended for potential future development and production. \nIn March 2024 McDaniel provided a resource update on the Unit 1B; \n\n46 MMbbls (P50) Contingent Resources – Development Pending in the eastern section of the greater Alameda field in the vicinity of the existing wells.\n90 MMbbls (P50) Prospective Resources of assigned in the western part of the field to reflect the uncertainty associated with being away from the existing wells. However\, McDaniels assigned a 70% chance of discovery to the prospective resource reflecting the low- risk nature of this area (given it is updip from the existing discoveries within the field). The risk associated with this area is based on reservoir deliverability.\n\nA preliminary field development plan is being developed for exploitation of Unit1B and an additional two wells focussing purely on production from Unit1B are being planned with the aim of initiating international oil export from Cuba.
URL:https://pesa.com.au/events/pesa-act-nsw-october-technical-lunch-2024/
LOCATION:Castlereagh Boutique Hotel\, 169 Castlereagh St\, Sydney\, NSW\, 2000\, Australia
CATEGORIES:NSW / ACT,Technical Lunch,Technical Talk
ORGANIZER;CN="PESA NSW Secretary":MAILTO:nsw-secretary@pesa.com.au
GEO:-33.872562;151.2089734
X-APPLE-STRUCTURED-LOCATION;VALUE=URI;X-ADDRESS=Castlereagh Boutique Hotel 169 Castlereagh St Sydney NSW 2000 Australia;X-APPLE-RADIUS=500;X-TITLE=169 Castlereagh St:geo:151.2089734,-33.872562
END:VEVENT
END:VCALENDAR